Full & Part Vessel Chartering
Direct global chartering of specialized heavy-lift vessels, multi-purpose general cargo ships, tugs, and ocean barges suited to bulk industrial modules.
Complex capital projects demand rigorous pre-transport methodology rather than improvised handling. Hemisphere’s dedicated projects division engineers end-to-end transport strategies for non-containerised, out-of-gauge (OOG), and ultra-heavy cargo across every continent.
From initial feasibility reviews and civil engineering route surveys through to quay-side port captaincy and final delivery onto foundation, our certified logistics planners integrate transport management plans, lifting diagrams, and risk assessments (RAMS) to ensure zero operational failure.
Years of heavy lift & out-of-gauge execution experience
Direct on-site engineering and port-side cargo management
Strict adherence to certified lifting plans, RAMS, & HSE protocols
Award-winning excellence recognized by the British International Freight Association
By coordinating specialized road haulage, coastal barges, heavy-geared freighters, and ocean charters, we eliminate intermediate handling risks.
Direct global chartering of specialized heavy-lift vessels, multi-purpose general cargo ships, tugs, and ocean barges suited to bulk industrial modules.
Roll-on/roll-off (RoRo) and conventional breakbulk arrangements for wheeled machinery, rail rolling stock, civil construction assets, and industrial drums.
Strategic deployment of flat racks, platform flats, and open-top containers with bespoke heavy lashing, blocking, and seaworthy timber bracing.
Swept-path analysis, bridge weight calculations, overhead utility clearances, dynamic axle loading evaluations, and formal Risk Assessments.
Thorough examination of shipping terms, technical bill of lading issuance, certified consular invoices, and specialized project customs brokerage.
Direct berth planning, floating crane hire, heavy tandem lifts, certified rigging teams, and cargo marshalling on port-centric quayside land.
Every project movement follows an audited, single-accountability workflow tailored to EPC contracts, project deadlines, and safety codes.
“I can't thank Hemisphere enough for the help in delivering the T-Pylons. It's safe to say without the Hemisphere team we couldn't have undertaken a project on this scale and been as successful as we have.”Balfour Beatty Project Management • Hinkley Point C Infrastructure
Documented performance moving critical components for energy installations, offshore pipelines, and high-capacity infrastructure.
Coordinated the transport of oversized structural T-pylon components through restrictive rural access corridors under exact site installation sequences.
Multimodal transfer of 132 subsea buoyancy units using specialized charter vessels and tailored securing arrangements to satisfy strict offshore maritime windows.
End-to-end relocation of a 132kV supergrid transformer, incorporating heavy-axle girder trailers, bridge structural monitoring, and precision jacking to foundation.
Core operational and engineering considerations for contractors, project directors, and overseas logistics buyers.
Project cargo refers to high-value, heavy, oversized, or time-critical shipments that cannot fit inside standard shipping containers. It requires individual technical engineering, tailored chartering, route surveys, civil permits, and specialized heavy lifting gear.
For heavy haulage or charter operations, engaging our team 2 to 6 months prior to shipment readiness is optimal. This provides necessary runway for highway structural surveys, statutory council notifications, permit issuance, and maritime vessel availability.
Yes. Our in-house customs team manages temporary admission procedures, ATA Carnets, inward processing relief (IPR), and bonded storage solutions so duty and VAT are suspended while equipment is utilized on site or prepared for re-export.
Yes. Every critical movement is supported by custom CAD lifting drawings, slinging calculations, structural spreader beam specifications, and fully accredited Risk Assessment and Method Statements (RAMS).
Consult with Hemisphere's project logistics directors to evaluate route feasibility, engineering requirements, and cost-efficient chartering.